Data centres.
Power you can rely on.
Data centres, server rooms and edge computing sites across British Columbia run 24/7, and even a short outage can mean lost data, broken service agreements and costly restarts. Ready Solar designs and installs commercial solar and battery energy storage systems (BESS) for data centres, colocation facilities, server rooms and telecom sites in Vancouver, Burnaby and across BC. Solar panels reduce daytime grid demand from cooling and IT equipment, while commercial batteries keep critical loads running through outages and help reduce costly peak demand charges.
Why data centres need solar and battery storage
- Fast backup power: Battery backup switches over in milliseconds on most systems, carrying servers and cooling until generators start or the grid returns.
Switchover time, runtime and output depend on the battery and inverter model, its state of charge and the load connected. For equipment that cannot tolerate any interruption, we recommend a UPS in line with the battery system. - Lower peak demand charges: Battery storage can cover short load spikes, reducing demand charges on BC Hydro commercial bills.
- Daytime solar offset: Rooftop, ground-mount or carport solar supplies part of the daytime power used by cooling systems and IT loads.
- Less generator runtime: Fewer diesel starts means lower fuel costs, less maintenance and fewer emissions.
- Clean energy goals: On-site solar and storage support the sustainability and ESG reporting that data center clients increasingly ask about.
How the Energy Storage Incentive can apply to data centres
A data centre battery may qualify for BC Hydro's commercial Energy Storage Incentive if the site has an eligible general-service account and the battery offers at least 25 kW of nominated capacity for automatic dispatch. Because nominated capacity can be less than the full battery size, we plan with you how much capacity is offered to BC Hydro and how much is designed around your backup needs. BC Hydro decides eligibility, approval and payment, so we review your account, critical loads and uptime requirements before any equipment is purchased.
What we design for data centres
- Load and uptime review: critical loads, existing UPS, generators and cooling
- Commercial battery sizing for backup runtime and peak demand reduction
- Rooftop, ground-mount and carport solar systems
- Coordination with your existing UPS, generator and electrical team
- System monitoring and performance reporting
- BC Hydro interconnection and Energy Storage Incentive paperwork
Data centre solar and battery installs across BC
We work with data centre operators, IT managers, property owners and developers throughout Metro Vancouver, including Vancouver, Burnaby, Richmond, Surrey, Coquitlam, Delta and Langley, as well as the Fraser Valley, Vancouver Island and the BC Interior. Whether you run a small server room or a growing edge data center, our licensed, in-house electricians handle the design, installation and incentive process from start to finish.
Good questions.
Clear answers.
Can solar panels power a data centre on their own?
No. A typical roof can supply only part of a data centre's daytime power. Solar works best combined with battery storage, the BC Hydro grid and existing generators, lowering energy costs and grid demand while batteries protect critical loads.
Do batteries replace a data center UPS or backup generator?
Usually not. Commercial batteries work alongside your UPS and generator, bridging outages, reducing generator runtime and cutting peak demand. We design the system around your existing backup setup.
Can a data centre battery qualify for the Energy Storage Incentive?
Possibly. The site needs an eligible BC Hydro general-service account and a new battery offering at least 25 kW of nominated capacity for automatic dispatch under a 10-year agreement. BC Hydro decides eligibility, so we review this before any equipment is bought.
